Zorlu Enerji Pakistan Limited

Zorlu Energy Pakistan Limited (ZEPL)

The Zorlu Energy Pakistan Limited (ZEPL) established the 56.4 MW Wind Power Project in Jhimpir, Sind Pakistan having 28 WTGs of VESTAS Make (each 1.8 MW) and 05 WTGs of VENSYs (each 1.2 MW) with 132 KV interconnection facilities. OMS (Private) Limited was appointed by ZEPL as Independent Engineer after the approval of CPPA. All the EPA related commissioning tests were witnessed by OMS team and the project COD was successfully achieved on July 26, 2013.

  • Testing of the Seller Interconnection Facilities
  • Testing of each WTG before Synchronization
  • WTG Commissioning test
  • Reliability Run Test
  • Anemometry system

Key Facts

Location

Jhimpir – Sindh, Pakistan

OMS Role

Independent Engineer

Period of Implementation

Dec 2012 ~ July 2013

Project Cost

143 Million USD