K-Electric hired the Consultancy Services of OMS for 500kV KKI GIS Grid Station, 500kV LILO Transmission Lines from NTDC & 220kV Transmission Lines LILO Baldia-Mauripur Circuits 01st July 2022

K-Electric hired the Consultancy Services of OMS for 500kV KKI GIS Grid Station, 500kV LILO Transmission Lines from NTDC &...
Read More
September 20, 2022

PEDO hired the Services of OMS as Independent Engineer for 40.8MW Koto Hydro HPP, 11.8MW Karora HPP and 10.2MW Jabori HPP 25th June 2022

PEDO hired the Services of OMS as Independent Engineer for 40.8MW Koto Hydro HPP, 11.8MW Karora HPP and 10.2MW Jabori...
Read More
September 20, 2022

K-Electric hired the Services of OMS for Third party performance testing (heat rate test) to K-Electric (900MW BQPS-III PP) as per NEPRA’s requirement 08th June 2022

K-Electric hired the Services of OMS for Third party performance testing (heat rate test) to K-Electric (900MW BQPS-III PP) as...
Read More
September 20, 2022

Pakistan Industrial Development Corporation (Pvt) Ltd signed contracted agreement with JV of OMS, EA Consulting, International Consulting 07th June 2022

Pakistan Industrial Development Corporation (Pvt) Ltd signed contracted agreement with JV of OMS, EA Consulting, International Consulting and Surbana Jurong...
Read More
September 20, 2022

NTDC hired the Services of OMS for Construction Supervision and allied activities of 220KV D/C T/B Transmission Line for 220KV Sumandri Grid Station 07th April 2022

NTDC hired the Services of OMS for Construction Supervision and allied activities of 220KV D/C T/B Transmission Line for 220KV...
Read More
September 20, 2022

K-Electric hired the Services of OMS for Evaluation of O&M Costs for BQPS-I, BQPS-II, BQPS-III, KPC, SGTPS and KGTPS 28th March, 2022

K-Electric hired the Services of OMS for Evaluation of O&M Costs for BQPS-I, BQPS-II, BQPS-III, KPC, SGTPS and KGTPS 28th...
Read More
September 20, 2022

DHA Multan hired the Service of OMS for Consultancy Services for Construction of 132kV GIS Grid Station – 2 – DHA Multan 31st January 2022

DHA Multan hired the Service of OMS for Consultancy Services for Construction of 132kV GIS Grid Station - 2 -...
Read More
September 20, 2022

QESCO hired the Services of OMS for (Relocation / Re-routing of QESCO’s Transmission and Distribution Network (132kV/11kV/0.415kV etc.) 18th January 2022

QESCO hired the Services of OMS for (Relocation / Re-routing of QESCO’s Transmission and Distribution Network (132kV/11kV/0.415kV etc.) as per...
Read More
September 20, 2022

OMS was hired by K-Electric for Technical due diligence in respect of induction of Siddiqson’s 300MW Thar Coal power Plant 13th January 2022