2.webp

Lakeside Energy Private Limited

Lakeside Energy Private Limited

Lakeside Energy Private Limited (LEPL) established the 50 MW Wind Power Project in Jhimpir, Sindh Pakistan having 25 WTGs of Siemens Gamesa Make (each 2.0 MW) with 132 KV interconnection facilities. 

OMS (Private) Limited was appointed by LEPL as Independent Engineer after the approval of CPPA. All the EPA related commissioning tests were witnessed by OMS team and the project COD was successfully achieved on April 13, 2022. 

  • Testing of the Seller Interconnection Facilities
  • Testing of each WTG before Synchronization
  • WTG Commissioning test
  • Reliability Run Test

Key Facts

Location

Jhimpir – Sindh, Pakistan

OMS Role

Independent Engineer

Period of Implementation

Sep 2021 ~ April 2022

Project Cost

78.1 Million USD

More Projects

Job Applicaiton Form


    This will close in 0 seconds