BPDB-RPCL Powergen Ltd.
As a part of the generation target of the Bangladesh Government, B-R Powergen Ltd. has selected about 40 Acres of land located at Char-Ishwardia mouza under Sadar upazila of Mymensingh District, Bangladesh for development of the large base load power station. Earlier, B-R Powergen Ltd. conducted a Pre-feasibility Study for setting up of 400 (±10%) MW Gas based Power Plant at that site. Now, a detailed impact analysis is required for the Feasibility study, Environmental Impact Assessment (EIA) and Social Impact Assessment are required for smooth functioning of this project.
OMS provided following services to BPDB-RPCL:
- Feasibility Study
- Environmental Impact Assessment (EIA)
- Initial Environmental Examination (IEE)
Key Facts
Location
Mymensingh, Bangladesh
OMS Role
Technical Consultant
Period of Implementation
March 2022 - Ongoing
Project Cost
0.16 Million USD