Metro Wind Power Limited

Metro Wind Power Limited

Metro Wind Power Limited (MWPL) established the 60 MW Wind Power Project in Jhimpir, Sindh Pakistan having 30 WTGs of Siemens Gamesa Make (each 2.0 MW) with 132 KV interconnection facilities. 

OMS (Private) Limited was appointed by MWPL as Independent Engineer after the approval of CPPA. All the EPA related commissioning tests were witnessed by the OMS team and the project COD was successfully achieved on June 6, 2022. 

  • Testing of the Seller Interconnection Facilities
  • Testing of each WTG before Synchronization
  • WTG Commissioning test
  • Reliability Run Test

Key Facts

Location

Jhimpir – Sindh, Pakistan

OMS Role

Independent Engineer

Period of Implementation

Aug 2021 ~ June 2022

Project Cost

93 Million USD